Carving Out the Windows
First Free is working with Solid Rock Construction. The Solid Rock crew has been excavating on the west side of our building to prepare the window wells. Their mini-excavator is perfect for working in that small space. The first photo shows concrete blocks that were original to our building. They have since been cut up and hoisted out.
The second photo is a digital rendering of the setup to come! We are excited for a tiered, landscaped egress design that provides natural light for our Lower Level Classrooms.

